AI-powered · Free · No account needed

Free Fit-Out ITP Generator

Generate a complete Inspection & Test Plan for interior fit-out works in seconds. Covers wall linings, ceiling systems, joinery installation, floor finishes, and services coordination — with hold points for pre-lining inspection and defect inspections.

  • Fit-out-specific hold points and witness points
  • Aligned with relevant Australian Standards
  • PDF emailed to you instantly — no login required
  • Ready to use on-site or submit to your principal contractor
Describe scope
Review ITP
Get PDF
Done

Include trade, materials, key activities, and any relevant standards (e.g. AS 3600). More detail = better ITP.

No account required. Takes about 10 seconds.

Background

What is a Fit-out ITP?

A fit-out ITP covers the inspection and testing requirements for interior construction works — including wall framing and linings, ceiling systems, joinery, door and hardware installation, floor finishes, and services coordination. It ensures that concealed work is inspected before lining, and that final finishes meet the quality standard.

Fit-out work involves extensive coordination between trades — electrical, mechanical, plumbing, fire, and data all need to be complete and inspected before linings close up the ceiling and wall cavities. A fit-out ITP with a pre-lining hold point ensures this coordination happens systematically rather than relying on verbal confirmations.

For commercial fit-out projects, the ITP typically covers both base-building and tenancy fit-out stages, with inspection criteria tailored to the finish quality specified in the project documentation.

Quality checkpoints

Fit-out ITP Hold Points & Witness Points

The AI generator automatically includes these checkpoints based on your scope description. Hold points require mandatory sign-off before work proceeds; witness points notify the relevant party but don't stop work.

Hold Points

Work stops until signed off

  • Pre-lining inspection (services complete, framing, acoustic and fire requirements)
  • Joinery installation sign-off
  • Pre-handover defect inspection

Witness Points

Party notified, work can continue

  • Wall framing and backing installation
  • Ceiling grid and tile installation
  • Floor preparation and levelling
  • Door and hardware installation

Applicable Australian Standards

  • AS/NZS 2589 — Gypsum Linings — Application and Finishing
  • NCC Volume 1 — Fire Resistance and Sound Insulation

Common questions

Fit-out ITP — Frequently Asked Questions

What is the most important hold point for fit-out work?
Pre-lining inspection is the most critical hold point. Before plasterboard or other linings are installed, all concealed services (electrical, mechanical, plumbing, fire, data) must be inspected and signed off. Acoustic and fire-rated wall constructions must also be verified at this stage. Once linings are installed, these items are concealed and can only be verified by destructive investigation.
Does a fit-out ITP need to cover all trades?
The fit-out ITP typically covers the builder's scope (framing, linings, ceilings, joinery, finishes) with the pre-lining hold point capturing all trade sign-offs. Individual trades (electrical, plumbing, mechanical, fire) usually have their own ITPs. The fit-out ITP ensures coordination between them.
Is a fit-out ITP different from a base-building ITP?
Yes. Base-building ITPs cover structure, facade, and building services. Fit-out ITPs cover interior construction from framing to finishes. On some projects, both are combined into a single document, but the inspection criteria and hold points differ. Tenancy fit-out ITPs are typically a subset focused on the tenant's specific scope.

Need to manage ITPs across a live project?

The free generator builds a single ITP. HoldPoint gives you the full workflow — templates, digital sign-offs, photo attachments, audit trails, and automatic PDF generation for every document on every project.

14 days free. No credit card to start.