Completion records
Get it in writing while he's still happy with the work
The builder walks the job, tells you it looks great, and shakes your hand. Six weeks later there is a problem with it and your invoice is on hold. A completion record takes about thirty seconds on site and turns “yeah, that's good” into something signed, timestamped and stamped with where he was standing.
Included in the $45 per active project plan. 7 days free.
Completion record
CR-MP3-042
- Work
- Ground floor joinery
- Location
- Units 4–9, Level 1
- Completed to
- Drawings & spec, Rev C
Dave Whelan · Site Manager
KTM Builders Pty Ltd
29 Jul 2026, 4:12pm AEST
−37.5989°, 144.9403° · 18°C, partly cloudy
Why this keeps happening
A handshake is not evidence
On the day
He is standing in front of finished work he is pleased with, and he will happily say so. This is the only moment where agreeing costs him nothing.
Six weeks later
Other trades have been through, the job has moved on, and the person who praised your work now has a budget problem. Suddenly the finish is “not quite right”.
In the argument
You have photos and a memory of a conversation. He has a back charge. Without a name against the work on the day, you are negotiating from nothing.
The fix is not more paperwork. It is one signature, taken at the only moment it is easy to get.
How it works
Thirty seconds, standing on the job
Write down what you did
Pick the project, describe the work, where it was, and what it was built to. Add photos of the finished job. No template to choose and no checklist to fill in.
He signs on the spot
Hand him your phone, or send a link he opens on his. He reads a short summary, signs with his finger, and that is it — no app, no account, no password.
You keep the record
It locks the moment he signs, with his name, his role, the time, the weather and the GPS coordinates of where he stood. Export it as a PDF whenever you need it.
What ends up on the record
Enough detail to settle it
Every record carries the same spine — the work, the place, the date, the standard it was built to, and who accepted it. Then you add whatever your trade actually needs.
- The standard it was built to
- “Approved drawings and spec, Rev C”. This is the line that turns a compliment into something defensible.
- Your own fields
- Batch numbers, torque figures, meter readings, bay numbers, permit references — name them yourself, as many as the job needs.
- Photos of the finished work
- Attached to the record the builder signs, so he is accepting exactly what he can see.
- Where and when he signed
- Time, GPS coordinates and site conditions captured at the moment of signing, not typed in afterwards.
- A value only you can see
- Record what the work is worth for your own tracking. It never appears on his screen — he is confirming the work, not approving a payment.
- A locked PDF
- Once signed, the record cannot be edited. Download it branded with your own logo whenever you need it.
You do not need an inspection plan for this
ITPs are the right tool when a head contractor demands one, and HoldPoint does those properly. But most subbies never get one signed, because building the plan comes before getting the signature — and the signature is the part that protects you. A completion record skips straight to it, and works for any trade.
FAQ
Common questions
Is a completion record legally binding?
Does the builder need a HoldPoint account?
Is he approving my invoice by signing this?
Do I need to build an ITP first?
What if he refuses to sign?
Can I record things specific to my trade?
What does it cost?
The next job you finish, get it signed
Set up in under five minutes. 7 days free — no credit card, no commitment.