All templates
WaterproofingCommercial

Podium Deck Waterproofing Inspection & Test Plan

ITP for podium deck and planter box waterproofing in multi-storey developments covering trafficable membrane systems, drainage design, expansion joints and long-term maintenance access.

12 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Substrate & Falls

Requires sign-off
P/F
Structural deflection criteria met
P/F
Falls to drainage points verified
Hold
P/F
Structural cracks treated prior to membrane
P/F
Substrate surface profile suitable for adhesion

Membrane System

Requires sign-off
P/F
Membrane system rated for trafficable application
P/F
Expansion joints treated per detail
HoldPhoto
P/F
Upstand heights per AS 4654.2
P/F
Planter internal lining continuous

Testing & Protection

Requires sign-off
P/F
Flood test satisfactory (48-hour minimum)
Hold Witness
P/F
Root barrier installed in planter areas
P/F
Protection and drainage layer installed
P/F
Long-term maintenance access provisions noted

Prefer AI?

Generate a custom Waterproofing ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a waterproofing supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free