WaterproofingCommercial
Podium Deck Waterproofing Inspection & Test Plan
ITP for podium deck and planter box waterproofing in multi-storey developments covering trafficable membrane systems, drainage design, expansion joints and long-term maintenance access.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Substrate & Falls
Requires sign-offP/F
Structural deflection criteria metP/F
Falls to drainage points verified Hold
P/F
Structural cracks treated prior to membraneP/F
Substrate surface profile suitable for adhesionMembrane System
Requires sign-offP/F
Membrane system rated for trafficable applicationP/F
Expansion joints treated per detail HoldPhoto
P/F
Upstand heights per AS 4654.2P/F
Planter internal lining continuousTesting & Protection
Requires sign-offP/F
Flood test satisfactory (48-hour minimum) Hold Witness
P/F
Root barrier installed in planter areasP/F
Protection and drainage layer installedP/F
Long-term maintenance access provisions notedPrefer AI?
Generate a custom Waterproofing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a waterproofing supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
