Planter Box Waterproofing Inspection & Test Plan
ITP for planter box waterproofing on podium and rooftop structures covering internal lining, root barriers, drainage layers, overflow provisions and long-term maintenance considerations.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Substrate Preparation
Requires sign-offP/F
Concrete fully cured and surface preparedP/F
Internal corner fillets installedP/F
Drain outlet pre-formed and preppedWaterproof Lining
Requires sign-offP/F
Membrane system rated for permanent immersion Hold
P/F
Membrane continuous to top of planter wallP/F
Reinforcing band at all corners and junctionsPhoto
P/F
Root barrier layer installed over membraneDrainage & Testing
Requires sign-offP/F
Drainage cell layer installed at baseP/F
Geotextile filter layer over drainage cellsP/F
Overflow outlet at correct heightP/F
Flood test satisfactory (48-hour minimum) Hold Witness
P/F
Inspection access for drain maintenance notedPrefer AI?
Generate a custom Waterproofing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a waterproofing supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free