Basement Waterproofing Inspection & Test Plan
ITP for below-ground basement waterproofing systems covering external membranes, waterstop installation, tanking systems, drainage boards and joint treatment per AS 3735.
12 checklist items
2 hold points
1 witness points
Checklist Preview
External Membrane
Requires sign-offP/F
Concrete substrate ground smooth and cleanP/F
Membrane applied per manufacturer specificationP/F
Membrane lap widths per specificationP/F
Protection board installed over membrane HoldPhoto
Waterstop & Joint Treatment
Requires sign-offP/F
Waterstop positioned at construction joints Hold Witness
P/F
Waterstop continuous with welded jointsP/F
Re-injectable grout tubes installed at jointsP/F
Joint sealant applied where specifiedDrainage & Completion
Requires sign-offP/F
Drainage dimple board installedP/F
Subsoil drain connected to stormwaterP/F
Backfill placed without membrane damage✓
Post-backfill leak monitoring period commencedPrefer AI?
Generate a custom Waterproofing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a waterproofing supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free