Basement Waterproofing Inspection & Test Plan
ITP for below-ground basement waterproofing systems covering external membranes, waterstop installation, tanking systems, drainage boards and joint treatment per AS 3735.
12 checklist items
2 hold points
1 witness points
Checklist Preview
External Membrane
Requires sign-offP/F
Concrete substrate ground smooth and cleanP/F
Membrane applied per manufacturer specificationP/F
Membrane lap widths per specificationP/F
Protection board installed over membrane HoldPhoto
Waterstop & Joint Treatment
Requires sign-offP/F
Waterstop positioned at construction joints Hold Witness
P/F
Waterstop continuous with welded jointsP/F
Re-injectable grout tubes installed at jointsP/F
Joint sealant applied where specifiedDrainage & Completion
Requires sign-offP/F
Drainage dimple board installedP/F
Subsoil drain connected to stormwaterP/F
Backfill placed without membrane damage✓
Post-backfill leak monitoring period commencedPrefer AI?
Generate a custom Waterproofing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free