TilingResidential
Tiling Waterproofing Integration Inspection & Test Plan
Dedicated ITP for the coordination between waterproofing and tiling trades covering membrane cure times, bond-breaker avoidance, screed adhesion and puddle flange integration for wet area tiling.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Membrane Readiness
Requires sign-offP/F
Membrane fully cured per manufacturer spec Hold
P/F
Adhesion test on membrane surface satisfactoryP/F
No bond-breaking contaminants on membraneP/F
Flood test certificate obtained Hold
Screed over Membrane
Requires sign-offP/F
Screed type compatible with membrane systemP/F
Screed graded to waste outletP/F
Screed thickness per specificationP/F
Puddle flange level with finished screed surface Witness
Wet Area Tiling
Requires sign-offP/F
Adhesive rated for wet area applicationP/F
Hob and niche tiling integrated with membraneP/F
Grout type suitable for wet area exposureP/F
Silicone at all internal corners and junctionsPrefer AI?
Generate a custom Tiling ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a flooring and tiling supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
