All templates
TilingResidential

Tiling Waterproofing Integration Inspection & Test Plan

Dedicated ITP for the coordination between waterproofing and tiling trades covering membrane cure times, bond-breaker avoidance, screed adhesion and puddle flange integration for wet area tiling.

12 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Membrane Readiness

Requires sign-off
P/F
Membrane fully cured per manufacturer spec
Hold
P/F
Adhesion test on membrane surface satisfactory
P/F
No bond-breaking contaminants on membrane
P/F
Flood test certificate obtained
Hold

Screed over Membrane

Requires sign-off
P/F
Screed type compatible with membrane system
P/F
Screed graded to waste outlet
P/F
Screed thickness per specification
P/F
Puddle flange level with finished screed surface
Witness

Wet Area Tiling

Requires sign-off
P/F
Adhesive rated for wet area application
P/F
Hob and niche tiling integrated with membrane
P/F
Grout type suitable for wet area exposure
P/F
Silicone at all internal corners and junctions

Prefer AI?

Generate a custom Tiling ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free