All templates
TilingResidential

Tiling Substrate Preparation Inspection & Test Plan

ITP for substrate preparation prior to tiling covering levelness, moisture testing, screed verification, waterproofing coordination and primer application per AS 3958.1.

11 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Substrate Verification

Requires sign-off
P/F
Substrate type suitable for tiling method
P/F
Flatness within 3mm in 3m (or per spec)
Hold
P/F
Substrate moisture content within limits
P/F
Screed fully cured (minimum 28 days cement)

Waterproofing Coordination

Requires sign-off
P/F
Waterproofing membrane cured and tested
Hold
P/F
Membrane undamaged prior to tiling
P/F
Puddle flanges clamped and sealed

Primer & Preparation

P/F
Primer type compatible with adhesive system
P/F
Primer applied to full coverage
P/F
Falls to waste outlets verified
P/F
Tile layout set-out approved
Witness

Ready to use this template?

Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.

Get started free