TilingResidential
Tiling Substrate Preparation Inspection & Test Plan
ITP for substrate preparation prior to tiling covering levelness, moisture testing, screed verification, waterproofing coordination and primer application per AS 3958.1.
11 checklist items
2 hold points
1 witness points
Checklist Preview
Substrate Verification
Requires sign-offP/F
Substrate type suitable for tiling methodP/F
Flatness within 3mm in 3m (or per spec) Hold
P/F
Substrate moisture content within limitsP/F
Screed fully cured (minimum 28 days cement)Waterproofing Coordination
Requires sign-offP/F
Waterproofing membrane cured and tested Hold
P/F
Membrane undamaged prior to tilingP/F
Puddle flanges clamped and sealedPrimer & Preparation
P/F
Primer type compatible with adhesive systemP/F
Primer applied to full coverageP/F
Falls to waste outlets verifiedP/F
Tile layout set-out approved Witness
Prefer AI?
Generate a custom Tiling ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free