Structural SteelCommercial
Structural Steel Fire Protection Coating Inspection & Test Plan
ITP for intumescent and cementitious fire protection coatings on structural steel including surface preparation, application, DFT measurement and adhesion testing per AS 1530.4.
14 checklist items
3 hold points
2 witness points
Checklist Preview
Surface Preparation
Requires sign-offP/F
Surface cleanliness to specified standardP/F
Primer compatible with fire protection system Hold
P/F
Primer DFT within manufacturer rangeP/F
Surface moisture content acceptableApplication
Requires sign-offP/F
Product batch numbers recordedP/F
Temperature and humidity within application rangeP/F
Application method per manufacturer datasheetP/F
Maximum thickness per pass maintainedP/F
Overcoat interval within specified windowDFT Inspection
Requires sign-offP/F
Wet film thickness checked during application Witness
P/F
Dry film thickness per FRL schedule Hold Witness
#
Average DFT reading (μm)P/F
Adhesion pull-off test satisfactory✓
Fire engineer sign-off obtained Hold
Ready to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free