Structural SteelCommercial
Structural Steel Fire Protection Coating Inspection & Test Plan
ITP for intumescent and cementitious fire protection coatings on structural steel including surface preparation, application, DFT measurement and adhesion testing per AS 1530.4.
14 checklist items
3 hold points
2 witness points
Checklist Preview
Surface Preparation
Requires sign-offP/F
Surface cleanliness to specified standardP/F
Primer compatible with fire protection system Hold
P/F
Primer DFT within manufacturer rangeP/F
Surface moisture content acceptableApplication
Requires sign-offP/F
Product batch numbers recordedP/F
Temperature and humidity within application rangeP/F
Application method per manufacturer datasheetP/F
Maximum thickness per pass maintainedP/F
Overcoat interval within specified windowDFT Inspection
Requires sign-offP/F
Wet film thickness checked during application Witness
P/F
Dry film thickness per FRL schedule Hold Witness
#
Average DFT reading (μm)P/F
Adhesion pull-off test satisfactory✓
Fire engineer sign-off obtained Hold
Prefer AI?
Generate a custom Structural Steel ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a structural steel supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
