Structural SteelCommercial
Structural Steel Fire Protection Coating Inspection & Test Plan
ITP for intumescent and cementitious fire protection coatings on structural steel including surface preparation, application, DFT measurement and adhesion testing per AS 1530.4.
14 checklist items
3 hold points
2 witness points
Checklist Preview
Surface Preparation
Requires sign-offP/F
Surface cleanliness to specified standardP/F
Primer compatible with fire protection system Hold
P/F
Primer DFT within manufacturer rangeP/F
Surface moisture content acceptableApplication
Requires sign-offP/F
Product batch numbers recordedP/F
Temperature and humidity within application rangeP/F
Application method per manufacturer datasheetP/F
Maximum thickness per pass maintainedP/F
Overcoat interval within specified windowDFT Inspection
Requires sign-offP/F
Wet film thickness checked during application Witness
P/F
Dry film thickness per FRL schedule Hold Witness
#
Average DFT reading (μm)P/F
Adhesion pull-off test satisfactory✓
Fire engineer sign-off obtained Hold
Prefer AI?
Generate a custom Structural Steel ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free