Structural SteelCommercial
Bolted Connection Inspection & Test Plan
ITP for high-strength bolted connections in structural steelwork covering bolt grade verification, installation method, tension verification and slip-critical joint inspection per AS 4100.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Bolt Supply & Verification
Requires sign-offP/F
Bolt grade markings match specification Hold
P/F
Bolt lot certification reviewedP/F
Bolts free from damage and corrosionP/F
Hardened washers provided per AS 4100Installation
Requires sign-offP/F
Bolt holes aligned without reamingP/F
Snug-tight condition achievedP/F
Tensioning method per specification (TC/DI/TW) Hold
P/F
Tightening sequence from center outwardTension Verification
Requires sign-offP/F
10% bolt tension audit satisfactory Hold Witness
P/F
TC bolt spline sheared (tension-control)P/F
Feeler gauge check on faying surfacesP/F
All bolts installed per connection detailReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free