Plumbing Rough-In Inspection & Test Plan
First-fix plumbing ITP covering water supply pipework, waste and vent piping, fixture point locations and pressure testing prior to concealment. Ensures compliance with AS/NZS 3500.
14 checklist items
2 hold points
1 witness points
Checklist Preview
Water Supply Pipework
Requires sign-offP/F
Pipe material and grade per specificationP/F
Pipe support spacing compliantP/F
Hot water pipe insulation installedP/F
Pressure test at 1500kPa for 30 minutes Hold Witness
P/F
Backflow prevention devices installedWaste & Vent Piping
Requires sign-offP/F
Pipe falls per AS/NZS 3500.2 (1:40 min)P/F
Traps installed at all fixture pointsP/F
Vent pipe termination height compliantP/F
Air admittance valves where permittedP/F
Drain tested with water to full bore Hold
Fixture Point Positions
P/F
Basin rough-in heights per drawingP/F
Toilet set-out dimensions verifiedP/F
Shower waste position correctP/F
Hose cock positions per specificationPrefer AI?
Generate a custom Plumbing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free