Plumbing Rough-In Inspection & Test Plan

First-fix plumbing ITP covering water supply pipework, waste and vent piping, fixture point locations and pressure testing prior to concealment. Ensures compliance with AS/NZS 3500.

14 checklist items
2 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Water Supply Pipework

Requires sign-off
P/F
Pipe material and grade per specification
P/F
Pipe support spacing compliant
P/F
Hot water pipe insulation installed
P/F
Pressure test at 1500kPa for 30 minutes
Hold Witness
P/F
Backflow prevention devices installed

Waste & Vent Piping

Requires sign-off
P/F
Pipe falls per AS/NZS 3500.2 (1:40 min)
P/F
Traps installed at all fixture points
P/F
Vent pipe termination height compliant
P/F
Air admittance valves where permitted
P/F
Drain tested with water to full bore
Hold

Fixture Point Positions

P/F
Basin rough-in heights per drawing
P/F
Toilet set-out dimensions verified
P/F
Shower waste position correct
P/F
Hose cock positions per specification

Prefer AI?

Generate a custom Plumbing ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a plumbing supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free