Hot Water System Installation Inspection & Test Plan

ITP for hot water system installation including storage or instantaneous units, tempering valve settings, relief valve piping and energy efficiency compliance per AS/NZS 3500.4.

13 checklist items
2 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Unit Installation

Requires sign-off
P/F
Unit positioned with required clearances
P/F
Seismic restraint installed if required
P/F
TPR valve discharge piped to safe location
Hold
P/F
Cold water isolation valve accessible
P/F
Expansion control valve installed

Tempering & Temperature Control

Requires sign-off
P/F
Thermostatic mixing valve installed
P/F
Outlet temperature ≤ 50°C at fixtures
Hold Witness
P/F
Storage temperature ≥ 60°C verified
#
Measured outlet temperature (°C)

Connections & Commissioning

P/F
Gas connection per AS 5601 (if applicable)
P/F
Electrical connection compliant
P/F
System flushed and commissioned
✓
Manufacturer warranty registered

Prefer AI?

Generate a custom Plumbing ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a plumbing supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free