PlumbingResidential
Hot Water System Installation Inspection & Test Plan
ITP for hot water system installation including storage or instantaneous units, tempering valve settings, relief valve piping and energy efficiency compliance per AS/NZS 3500.4.
13 checklist items
2 hold points
1 witness points
Checklist Preview
Unit Installation
Requires sign-offP/F
Unit positioned with required clearancesP/F
Seismic restraint installed if requiredP/F
TPR valve discharge piped to safe location Hold
P/F
Cold water isolation valve accessibleP/F
Expansion control valve installedTempering & Temperature Control
Requires sign-offP/F
Thermostatic mixing valve installedP/F
Outlet temperature ≤ 50°C at fixtures Hold Witness
P/F
Storage temperature ≥ 60°C verified#
Measured outlet temperature (°C)Connections & Commissioning
P/F
Gas connection per AS 5601 (if applicable)P/F
Electrical connection compliantP/F
System flushed and commissioned✓
Manufacturer warranty registeredPrefer AI?
Generate a custom Plumbing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a plumbing supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free