PlumbingResidential
Greywater Recycling System Inspection & Test Plan
ITP for greywater treatment and reuse systems covering collection pipework, treatment unit installation, irrigation distribution, cross-connection prevention and compliance with AS/NZS 1547.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Collection Pipework
Requires sign-offP/F
Greywater sources connected per designP/F
Diverter valve to sewer installedP/F
No cross-connection with potable water supply Hold
P/F
Greywater pipes labelled per AS/NZS 3500Treatment Unit
Requires sign-offP/F
Treatment unit installed per manufacturer specP/F
Electrical connection compliantP/F
Overflow connection to sewerP/F
Treatment system holds NSW Health (or equiv.) approval Hold
Distribution & Commissioning
Requires sign-offP/F
Subsurface irrigation per design layoutP/F
System flushed and distribution tested Witness
P/F
Greywater warning signs at all outlets✓
O&M manual provided to ownerReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free