All templates
PlumbingResidential

Greywater Recycling System Inspection & Test Plan

ITP for greywater treatment and reuse systems covering collection pipework, treatment unit installation, irrigation distribution, cross-connection prevention and compliance with AS/NZS 1547.

12 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Collection Pipework

Requires sign-off
P/F
Greywater sources connected per design
P/F
Diverter valve to sewer installed
P/F
No cross-connection with potable water supply
Hold
P/F
Greywater pipes labelled per AS/NZS 3500

Treatment Unit

Requires sign-off
P/F
Treatment unit installed per manufacturer spec
P/F
Electrical connection compliant
P/F
Overflow connection to sewer
P/F
Treatment system holds NSW Health (or equiv.) approval
Hold

Distribution & Commissioning

Requires sign-off
P/F
Subsurface irrigation per design layout
P/F
System flushed and distribution tested
Witness
P/F
Greywater warning signs at all outlets
O&M manual provided to owner

Ready to use this template?

Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.

Get started free