PaintingCommercial
Surface Preparation for Painting Inspection & Test Plan
ITP for surface preparation prior to painting including substrate assessment, cleaning, sanding, filling, priming and moisture testing for internal and external surfaces per AS/NZS 2311.
12 checklist items
2 hold points
Checklist Preview
Substrate Assessment
Requires sign-offP/F
Substrate type identified and documentedP/F
Substrate moisture content within limits Hold
#
Moisture meter reading (%)P/F
Cracks, holes and defects repairedCleaning & Preparation
Requires sign-offP/F
Surface free from dust and contaminantsP/F
Sanding and keying of surface completeP/F
Fillers fully cured and sanded flushP/F
Adjacent surfaces masked and protectedPrimer Application
Requires sign-offP/F
Primer product per paint specificationP/F
Primer applied to full coverageP/F
Primer DFT per specification Hold
P/F
Minimum drying time before overcoatReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free