LandscapingCivil
Stormwater Swale & Rain Garden Inspection & Test Plan
ITP for WSUD stormwater management features including bio-retention swales, rain gardens, permeable paving sub-bases and gross pollutant traps covering grading, filter media and planting.
13 checklist items
2 hold points
1 witness points
Checklist Preview
Earthworks & Grading
Requires sign-offP/F
Swale grades per civil design Hold
P/F
Subgrade levels within toleranceP/F
Inlet and outlet levels per designP/F
Overflow weir set to correct levelFilter Media & Drainage
Requires sign-offP/F
Geotextile liner installed per specificationP/F
Drainage aggregate layer placed and gradedP/F
Slotted collection pipe installed at baseP/F
Filter media depth per design (typically 400-600mm) Hold
P/F
Filter media meets hydraulic conductivity specPlanting & Completion
Requires sign-offP/F
Plant species per WSUD planting scheduleP/F
Planting density per design Witness
P/F
Jute mat or rock mulch (no floating mulch)✓
Establishment watering program commencedPrefer AI?
Generate a custom Landscaping ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a landscaping supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
