All templates
LandscapingCommercial

Playground Softfall Installation Inspection & Test Plan

ITP for playground impact-attenuating surfaces covering subgrade preparation, drainage, rubber wet-pour or synthetic grass installation, fall height compliance and certification per AS 4422.

13 checklist items
3 hold points
1 witness points
Use this template — it's free

Checklist Preview

Subgrade & Drainage

Requires sign-off
P/F
Subgrade excavated to correct depth and graded
P/F
Drainage provisions installed
P/F
Subgrade compacted and stable
P/F
Edge containment installed and secure

Softfall Installation

Requires sign-off
P/F
Softfall type per specification (wet-pour/tiles/grass)
P/F
Base layer (SBR) thickness per fall height chart
Hold
P/F
Top layer colour and EPDM grade per specification
P/F
Total thickness per critical fall height
Hold
P/F
Seams bonded with no gaps or lifting

Testing & Certification

Requires sign-off
P/F
HIC (Head Injury Criterion) test satisfactory per AS 4422
Hold Witness
P/F
Surface draining with no ponding
P/F
Softfall integrated with equipment footings
Aa
Impact attenuation test certificate reference

Prefer AI?

Generate a custom Landscaping ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free