LandscapingCommercial
Playground Softfall Installation Inspection & Test Plan
ITP for playground impact-attenuating surfaces covering subgrade preparation, drainage, rubber wet-pour or synthetic grass installation, fall height compliance and certification per AS 4422.
13 checklist items
3 hold points
1 witness points
Checklist Preview
Subgrade & Drainage
Requires sign-offP/F
Subgrade excavated to correct depth and gradedP/F
Drainage provisions installedP/F
Subgrade compacted and stableP/F
Edge containment installed and secureSoftfall Installation
Requires sign-offP/F
Softfall type per specification (wet-pour/tiles/grass)P/F
Base layer (SBR) thickness per fall height chart Hold
P/F
Top layer colour and EPDM grade per specificationP/F
Total thickness per critical fall height Hold
P/F
Seams bonded with no gaps or liftingTesting & Certification
Requires sign-offP/F
HIC (Head Injury Criterion) test satisfactory per AS 4422 Hold Witness
P/F
Surface draining with no pondingP/F
Softfall integrated with equipment footingsAa
Impact attenuation test certificate referencePrefer AI?
Generate a custom Landscaping ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a landscaping supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
