All templates
LandscapingCommercial

Playground Softfall Installation Inspection & Test Plan

ITP for playground impact-attenuating surfaces covering subgrade preparation, drainage, rubber wet-pour or synthetic grass installation, fall height compliance and certification per AS 4422.

13 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Subgrade & Drainage

Requires sign-off
P/F
Subgrade excavated to correct depth and graded
P/F
Drainage provisions installed
P/F
Subgrade compacted and stable
P/F
Edge containment installed and secure

Softfall Installation

Requires sign-off
P/F
Softfall type per specification (wet-pour/tiles/grass)
P/F
Base layer (SBR) thickness per fall height chart
Hold
P/F
Top layer colour and EPDM grade per specification
P/F
Total thickness per critical fall height
Hold
P/F
Seams bonded with no gaps or lifting

Testing & Certification

Requires sign-off
P/F
HIC (Head Injury Criterion) test satisfactory per AS 4422
Hold Witness
P/F
Surface draining with no ponding
P/F
Softfall integrated with equipment footings
Aa
Impact attenuation test certificate reference

Prefer AI?

Generate a custom Landscaping ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a landscaping supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free