HVACCommercial
VRF / Split System Installation Inspection & Test Plan
ITP for variable refrigerant flow and split system air conditioning covering indoor/outdoor unit mounting, refrigerant piping, condensate drainage, electrical connections and commissioning.
14 checklist items
2 hold points
1 witness points
Checklist Preview
Outdoor Unit
Requires sign-offP/F
Outdoor unit position per design and noise limitsP/F
Structural support adequate for unit weightP/F
Vibration isolation mounts installedP/F
Manufacturer clearances maintained for airflowIndoor Units
Requires sign-offP/F
Indoor unit positions per mechanical drawingsP/F
Mounting brackets secure and levelP/F
Condensate drain graded and connectedP/F
Condensate pump installed where gravity drain not possibleP/F
Access provided for maintenance (concealed units)Commissioning
Requires sign-offP/F
Refrigerant charge per manufacturer calculation Hold
P/F
VRF addressing and network setup completeP/F
Cooling and heating operation verified Hold Witness
P/F
Room controllers and schedules programmedP/F
Refrigerant leak detection satisfactoryPrefer AI?
Generate a custom HVAC ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free