VRF / Split System Installation Inspection & Test Plan
ITP for variable refrigerant flow and split system air conditioning covering indoor/outdoor unit mounting, refrigerant piping, condensate drainage, electrical connections and commissioning.
14 checklist items
2 hold points
1 witness points
Checklist Preview
Outdoor Unit
Requires sign-offP/F
Outdoor unit position per design and noise limitsP/F
Structural support adequate for unit weightP/F
Vibration isolation mounts installedP/F
Manufacturer clearances maintained for airflowIndoor Units
Requires sign-offP/F
Indoor unit positions per mechanical drawingsP/F
Mounting brackets secure and levelP/F
Condensate drain graded and connectedP/F
Condensate pump installed where gravity drain not possibleP/F
Access provided for maintenance (concealed units)Commissioning
Requires sign-offP/F
Refrigerant charge per manufacturer calculation Hold
P/F
VRF addressing and network setup completeP/F
Cooling and heating operation verified Hold Witness
P/F
Room controllers and schedules programmedP/F
Refrigerant leak detection satisfactoryPrefer AI?
Generate a custom HVAC ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a mechanical (HVAC) supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free