All templates
HVACCommercial

Chiller Plant Installation Inspection & Test Plan

ITP for chiller plant and associated systems covering equipment positioning, piping connections, electrical supply, vibration isolation, refrigerant charge and performance testing.

14 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Equipment Positioning

Requires sign-off
P/F
Chiller positioned per mechanical drawings
P/F
Structural support and pads adequate
P/F
Vibration isolators installed and levelled
P/F
Tube pull and maintenance clearances provided

Piping & Electrical

Requires sign-off
P/F
Chilled water piping connected and flushed
P/F
Condenser water piping connected
P/F
Flexible connections at chiller inlet/outlet
P/F
Electrical supply per chiller nameplate
Hold
P/F
VSD configured per manufacturer settings

Commissioning

Requires sign-off
P/F
Refrigerant charge verified
P/F
Oil charge level per manufacturer spec
P/F
Performance test at design conditions
Hold Witness
P/F
All safety cutouts tested and verified
P/F
BMS integration and alarm points verified

Prefer AI?

Generate a custom HVAC ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free