HVACCommercial
Chiller Plant Installation Inspection & Test Plan
ITP for chiller plant and associated systems covering equipment positioning, piping connections, electrical supply, vibration isolation, refrigerant charge and performance testing.
14 checklist items
2 hold points
1 witness points
Checklist Preview
Equipment Positioning
Requires sign-offP/F
Chiller positioned per mechanical drawingsP/F
Structural support and pads adequateP/F
Vibration isolators installed and levelledP/F
Tube pull and maintenance clearances providedPiping & Electrical
Requires sign-offP/F
Chilled water piping connected and flushedP/F
Condenser water piping connectedP/F
Flexible connections at chiller inlet/outletP/F
Electrical supply per chiller nameplate Hold
P/F
VSD configured per manufacturer settingsCommissioning
Requires sign-offP/F
Refrigerant charge verifiedP/F
Oil charge level per manufacturer specP/F
Performance test at design conditions Hold Witness
P/F
All safety cutouts tested and verifiedP/F
BMS integration and alarm points verifiedPrefer AI?
Generate a custom HVAC ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a mechanical (HVAC) supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
