GlazingCommercial
Shopfront Glazing Inspection & Test Plan
ITP for shopfront glazing systems covering aluminium framing, glass installation, entrance doors, floor spring operation and compliance with NCC accessibility and safety glazing requirements.
13 checklist items
1 hold points
1 witness points
Checklist Preview
Framing
Requires sign-offP/F
Frame material and finish per specificationP/F
Frame alignment plumb and levelP/F
Threshold detail per accessibility requirementsP/F
Frame fixed to structure per designGlass & Doors
Requires sign-offP/F
Safety glass per AS 1288 requirements Hold
P/F
Manifestation markings per NCCP/F
Door closer/floor spring adjusted correctlyP/F
Door swing and clearance per AS 1428.1P/F
Door hardware per specification (pull handles, locks)Sealing & Completion
Requires sign-offP/F
Weather seals installed and effectiveP/F
Silicone joints neat and continuousP/F
Glass cleaned and free from scratchesP/F
All doors operating and self-closing correctly Witness