GlazingCommercial
Fire-Rated Glazing Inspection & Test Plan
ITP for fire-rated glazing systems covering frame and glass FRL verification, intumescent seal installation, framing fixing, labelling and compliance with AS 1530.4 tested configurations.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Frame Installation
Requires sign-offP/F
Frame system matches AS 1530.4 test report Hold
P/F
Frame fixing method per tested configurationP/F
Frame-to-wall gap sealed per tested detailP/F
Intumescent strips installed per configurationFire-Rated Glass
Requires sign-offP/F
Glass FRL matches wall/partition FRL requirement Hold
P/F
Fire-rated marking etched on glassP/F
Glazing beads per tested configurationP/F
Panel size within tested maximum dimensionsCompliance & Documentation
Requires sign-offP/F
Fire test report provided and reviewed Hold Witness
P/F
Certificate of conformity from manufacturerP/F
Fire door label affixed (if operable)✓
Entry added to passive fire protection registerPrefer AI?
Generate a custom Glazing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free