All templates
GlazingCommercial

Fire-Rated Glazing Inspection & Test Plan

ITP for fire-rated glazing systems covering frame and glass FRL verification, intumescent seal installation, framing fixing, labelling and compliance with AS 1530.4 tested configurations.

12 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Frame Installation

Requires sign-off
P/F
Frame system matches AS 1530.4 test report
Hold
P/F
Frame fixing method per tested configuration
P/F
Frame-to-wall gap sealed per tested detail
P/F
Intumescent strips installed per configuration

Fire-Rated Glass

Requires sign-off
P/F
Glass FRL matches wall/partition FRL requirement
Hold
P/F
Fire-rated marking etched on glass
P/F
Glazing beads per tested configuration
P/F
Panel size within tested maximum dimensions

Compliance & Documentation

Requires sign-off
P/F
Fire test report provided and reviewed
Hold Witness
P/F
Certificate of conformity from manufacturer
P/F
Fire door label affixed (if operable)
✓
Entry added to passive fire protection register

Prefer AI?

Generate a custom Glazing ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a glazing supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free