GlazingCommercial
Glass Balustrade Inspection & Test Plan
ITP for frameless and semi-frameless glass balustrade systems covering glass specification, spigot or channel installation, structural adequacy and compliance with AS 1170 loading requirements.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Fixing System
Requires sign-offP/F
Spigot/channel type per structural designP/F
Fixing spacing per engineer specificationP/F
Core drill depth and anchor set correct Hold
P/F
Base plates or channels set levelGlass Installation
Requires sign-offP/F
Toughened/laminated glass per AS 1288 Hold
P/F
Glass thickness per structural designP/F
Glass panels plumb and correctly seatedP/F
Gap between panels per specificationHandrail & Testing
Requires sign-offP/F
Handrail fixed and continuousP/F
Handrail height per NCC (min 1000mm)P/F
Proof load test satisfactory per AS 1170 Hold Witness
P/F
Non-climbable per NCC requirementsPrefer AI?
Generate a custom Glazing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a glazing supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
