All templates
GlazingCommercial

Glass Balustrade Inspection & Test Plan

ITP for frameless and semi-frameless glass balustrade systems covering glass specification, spigot or channel installation, structural adequacy and compliance with AS 1170 loading requirements.

12 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Fixing System

Requires sign-off
P/F
Spigot/channel type per structural design
P/F
Fixing spacing per engineer specification
P/F
Core drill depth and anchor set correct
Hold
P/F
Base plates or channels set level

Glass Installation

Requires sign-off
P/F
Toughened/laminated glass per AS 1288
Hold
P/F
Glass thickness per structural design
P/F
Glass panels plumb and correctly seated
P/F
Gap between panels per specification

Handrail & Testing

Requires sign-off
P/F
Handrail fixed and continuous
P/F
Handrail height per NCC (min 1000mm)
P/F
Proof load test satisfactory per AS 1170
Hold Witness
P/F
Non-climbable per NCC requirements

Prefer AI?

Generate a custom Glazing ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a glazing supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free