FormworkCommercial
Standard Formwork Inspection & Test Plan
ITP for standard in-situ formwork systems covering timber and proprietary systems, propping design, alignment tolerances, safety provisions and striking criteria per AS 3610.
13 checklist items
3 hold points
1 witness points
Checklist Preview
Design & Certification
Requires sign-offP/F
Formwork design reviewed by engineer Hold
P/F
Prop load tables checked for floor loading✓
SWMS reviewed and communicatedErection
Requires sign-offP/F
Soffit level set per structural drawingsP/F
Props plumb and pin securedP/F
Props on adequate base with sole platesP/F
Horizontal and cross bracing per design Hold
P/F
Decking joints tight with no concrete leak pathsP/F
Edge beam formwork set to correct dimensionsSafety & Striking
Requires sign-offP/F
Edge protection at all open edgesP/F
Penetrations covered or barricadedP/F
Written striking approval from engineer Hold Witness
P/F
Reshoring plan documented and followedReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free