FormworkCommercial
Standard Formwork Inspection & Test Plan
ITP for standard in-situ formwork systems covering timber and proprietary systems, propping design, alignment tolerances, safety provisions and striking criteria per AS 3610.
13 checklist items
3 hold points
1 witness points
Checklist Preview
Design & Certification
Requires sign-offP/F
Formwork design reviewed by engineer Hold
P/F
Prop load tables checked for floor loading✓
SWMS reviewed and communicatedErection
Requires sign-offP/F
Soffit level set per structural drawingsP/F
Props plumb and pin securedP/F
Props on adequate base with sole platesP/F
Horizontal and cross bracing per design Hold
P/F
Decking joints tight with no concrete leak pathsP/F
Edge beam formwork set to correct dimensionsSafety & Striking
Requires sign-offP/F
Edge protection at all open edgesP/F
Penetrations covered or barricadedP/F
Written striking approval from engineer Hold Witness
P/F
Reshoring plan documented and followedPrefer AI?
Generate a custom Formwork ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free