All templates
FormworkCommercial

Standard Formwork Inspection & Test Plan

ITP for standard in-situ formwork systems covering timber and proprietary systems, propping design, alignment tolerances, safety provisions and striking criteria per AS 3610.

13 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Design & Certification

Requires sign-off
P/F
Formwork design reviewed by engineer
Hold
P/F
Prop load tables checked for floor loading
✓
SWMS reviewed and communicated

Erection

Requires sign-off
P/F
Soffit level set per structural drawings
P/F
Props plumb and pin secured
P/F
Props on adequate base with sole plates
P/F
Horizontal and cross bracing per design
Hold
P/F
Decking joints tight with no concrete leak paths
P/F
Edge beam formwork set to correct dimensions

Safety & Striking

Requires sign-off
P/F
Edge protection at all open edges
P/F
Penetrations covered or barricaded
P/F
Written striking approval from engineer
Hold Witness
P/F
Reshoring plan documented and followed

Prefer AI?

Generate a custom Formwork ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a formwork supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free