Slip Form Inspection & Test Plan

ITP for slip-form concrete construction covering form design, jacking system, reinforcement placement, concrete supply continuity and verticality monitoring for silos, cores and towers.

12 checklist items
3 hold points
2 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Slip Form Setup

Requires sign-off
P/F
Form panels assembled and aligned
P/F
Jack rods installed and tested
Hold
P/F
Jack synchronisation verified
P/F
Work platforms and safety harness points installed

Continuous Pour Operations

Requires sign-off
P/F
Concrete supply continuity plan confirmed
Hold
P/F
Lift rate maintained per specification
P/F
Reinforcement placed ahead of rising form
Witness
P/F
Embedments placed at correct elevations

Quality Monitoring

Requires sign-off
P/F
Verticality within tolerance (plumb bob/laser)
Hold Witness
P/F
Wall thickness measured and within tolerance
P/F
Early age strength monitoring satisfactory
P/F
Surface defects repaired progressively

Prefer AI?

Generate a custom Formwork ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a formwork supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free