Precast Formwork & Mould Inspection & Test Plan

ITP for precast concrete moulds and formwork covering mould fabrication, dimensional tolerances, release agent application, insert placement and demoulding procedures.

11 checklist items
3 hold points
1 witness points
Use this template — it's free

Checklist Preview

Mould Fabrication

Requires sign-off
P/F
Mould dimensions per production drawings
Hold
P/F
Mould surface finish suitable for required class
P/F
Side rails or magnetic formwork aligned

Pre-Pour

Requires sign-off
P/F
Release agent uniformly applied
P/F
Cast-in inserts positioned per drawing
Hold Witness
P/F
Lifting anchors at correct position and depth
P/F
Reinforcement cover verified with spacers

Demoulding & Handling

Requires sign-off
P/F
Minimum demoulding strength achieved
Hold
P/F
Demoulding procedure followed without damage
P/F
Element marked with ID and orientation
P/F
Stored on appropriate dunnage and supports

Prefer AI?

Generate a custom Formwork ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free