FormworkCommercial
Climbing Formwork Inspection & Test Plan
ITP for climbing formwork systems (crane-climbed or self-climbing) covering system assembly, connection points, climbing sequence, safety provisions and cycle time management.
12 checklist items
3 hold points
1 witness points
Checklist Preview
System Assembly
Requires sign-offP/F
Climbing system engineering certification Hold
P/F
Climbing rails and shoes installed per drawingP/F
Hydraulic climbing system testedP/F
Working and trailing platforms assembledClimbing Cycle
Requires sign-offP/F
Climbing cone anchors verified before climb Hold
P/F
Concrete strength for climbing achieved Hold
P/F
Climbing sequence per approved procedure Witness
P/F
Form level and alignment verified after climbSafety Systems
Requires sign-offP/F
Fall arrest systems operationalP/F
Platform access gates functioningP/F
Wind speed within climbing limits✓
Pre-climb safety checklist completedPrefer AI?
Generate a custom Formwork ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a formwork supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
