Fire Sprinkler System Inspection & Test Plan

ITP for automatic fire sprinkler systems covering pipework installation, head placement, hydraulic testing, alarm valve operation and system commissioning per AS 2118.

13 checklist items
2 hold points
2 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Pipework Installation

Requires sign-off
P/F
Pipe material and class per specification
P/F
Pipe hanger spacing per AS 2118
P/F
Seismic bracing installed per NZS 4219
P/F
Branch line spacing per design

Sprinkler Heads

Requires sign-off
P/F
Head type and temperature rating correct
Hold
P/F
Deflector-to-ceiling distance per AS 2118
P/F
Head coverage area within maximum spacing
P/F
Obstruction clearance rules satisfied

Testing & Commissioning

Requires sign-off
P/F
Hydrostatic test at 1400kPa for 2 hours
Hold Witness
P/F
Alarm valve operation satisfactory
P/F
Flow switch activating fire panel
Witness
P/F
Main drain test flow satisfactory
✓
Block plan installed at alarm valve

Prefer AI?

Generate a custom Fire Protection ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a fire protection supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free