All templates
Fire ProtectionCommercial

Smoke Management System Inspection & Test Plan

ITP for mechanical smoke management systems covering smoke exhaust fans, stair pressurisation, automatic opening vents, controls integration and commissioning per AS 1668.1.

12 checklist items
3 hold points
2 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Smoke Exhaust System

Requires sign-off
P/F
Exhaust fan rated for high temperature operation
P/F
Smoke exhaust ductwork fire-rated
P/F
Exhaust volume per fire engineering report
Hold
P/F
Make-up air provisions adequate

Stair Pressurisation

Requires sign-off
P/F
Pressurisation fan duty per design
P/F
Door pressure differential within 50Pa limit
Hold Witness
P/F
Door opening force ≤ 110N
P/F
Pressure relief provisions operational

Controls & Commissioning

Requires sign-off
P/F
Interface with fire indicator panel verified
Hold Witness
P/F
Cause and effect scenarios tested
P/F
Automatic opening vents operational
Aa
Commissioning report reference

Prefer AI?

Generate a custom Fire Protection ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a fire protection supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free