Fire Hydrant System Inspection & Test Plan

ITP for building fire hydrant systems covering pipework, hydrant valve installation, booster assembly, flow and pressure testing per AS 2419.1 and authority requirements.

12 checklist items
3 hold points
2 witness points
Use this template — it's free

Checklist Preview

Pipework

Requires sign-off
P/F
Pipe material and rating per AS 2419.1
P/F
Pipe routing per hydraulic design
P/F
Isolation valves at required locations
P/F
Fire-rated penetration sealing
Hold

Hydrant Valves & Landing Valves

Requires sign-off
P/F
Hydrant valve height per AS 2419.1
P/F
Hydrant signage and marking installed
P/F
Landing valves accessible in stair pressurisation zone

Booster Assembly & Testing

Requires sign-off
P/F
Booster assembly per AS 2419.1 detail
Hold
P/F
Hydrostatic test satisfactory
Hold Witness
P/F
Flow and pressure test at most remote hydrant
Witness
P/F
Fire brigade connection approved
System block plan installed at booster