Pipework

Requires sign-off
P/F
Pipe material and rating per AS 2419.1
P/F
Pipe routing per hydraulic design
P/F
Isolation valves at required locations
P/F
Fire-rated penetration sealing
Hold

Hydrant Valves & Landing Valves

Requires sign-off
P/F
Hydrant valve height per AS 2419.1
P/F
Hydrant signage and marking installed
P/F
Landing valves accessible in stair pressurisation zone

Booster Assembly & Testing

Requires sign-off
P/F
Booster assembly per AS 2419.1 detail
Hold
P/F
Hydrostatic test satisfactory
Hold Witness
P/F
Flow and pressure test at most remote hydrant
Witness
P/F
Fire brigade connection approved
System block plan installed at booster

Prefer AI?

Generate a custom Fire Protection ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free