Fire ProtectionCommercial
Fire Door & Smoke Door Inspection & Test Plan
ITP for fire-rated and smoke door installation covering frame fixing, door leaf installation, hardware, intumescent seals, hold-open devices and operational testing per AS 1905.1.
12 checklist items
3 hold points
2 witness points
Checklist Preview
Frame Installation
Requires sign-offP/F
Frame material and FRL per door scheduleP/F
Frame fixed plumb, level and squareP/F
Frame-to-wall gap sealed with fire sealant Hold
Door Leaf & Hardware
Requires sign-offP/F
Door leaf FRL matches schedule Hold
P/F
Fire door identification tag affixedP/F
Intumescent and smoke seals installedP/F
Door closer adjusted for full positive latchingP/F
All hardware fire-rated and compatibleOperational Testing
Requires sign-offP/F
Door self-closes and latches from any position Hold Witness
P/F
Hold-open device releases on fire alarm signal Witness
P/F
Gap clearances within AS 1905.1 limitsP/F
Fire door signage per NCC requirementsReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free