All templates
ExcavationCivil

Trench Excavation Inspection & Test Plan

ITP for trench excavation for services installation covering trench dimensions, shoring/benching, safe access, pipe bedding preparation and backfill compaction requirements.

12 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Trench Setup

Requires sign-off
P/F
Trench alignment per service design
P/F
Clearance from existing services confirmed
Hold
P/F
Shoring or benching per depth requirements
Hold
P/F
Safe access/egress within 9m of all workers

Excavation & Preparation

Requires sign-off
P/F
Trench width per pipe diameter requirements
P/F
Trench depth per service drawing
P/F
Trench floor grade verified
Witness
P/F
Bedding material spread and compacted

Backfill & Compaction

Requires sign-off
P/F
Haunch zone compacted around pipe
P/F
Backfill placed in maximum 150mm layers
#
Compaction test results (% MDD)
Hold
✓
Warning marker tape installed above services

Prefer AI?

Generate a custom Excavation ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a civil and earthworks supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free