ExcavationCivil
Rock Excavation Inspection & Test Plan
ITP for rock excavation covering rock classification, excavation method selection, vibration limits, blast monitoring (if applicable) and rock face stability assessment.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Rock Classification
Requires sign-offP/F
Rock type and hardness assessedP/F
Geotechnical engineer confirms rock class Hold
P/F
Excavation method selected (rip/hammer/blast)Excavation
Requires sign-offP/F
Vibration monitors installed at boundaries Hold
P/F
Vibration levels within PPV limits Witness
#
Peak particle velocity reading (mm/s)P/F
Rock face stability maintained during worksP/F
No over-excavation beyond design linesCompletion
Requires sign-offP/F
Formation level survey within toleranceP/F
Exposed rock face treated per specificationP/F
Spoil classified for reuse or disposalAa
Vibration monitoring report referenceReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free