ElectricalResidential
Solar PV System Inspection & Test Plan
Covers rooftop solar photovoltaic installation including panel mounting, DC cabling, inverter installation, grid connection and anti-islanding protection per AS/NZS 5033 and AS 4777.
14 checklist items
3 hold points
1 witness points
Checklist Preview
Panel Mounting
Requires sign-offP/F
Roof structural adequacy confirmed Hold
P/F
Mounting rail fixing torque verifiedP/F
Panel orientation and tilt per designP/F
Panel clamps secure with correct torqueP/F
Boundary and ridge setbacks compliantDC Wiring & Protection
Requires sign-offP/F
DC cables UV-rated and correctly supportedP/F
MC4 connector engagement verified#
String Voc measurementP/F
DC isolator installed at array and inverter Hold
Inverter & Grid Connection
Requires sign-offP/F
Inverter mounted per manufacturer specsP/F
Anti-islanding protection verified Hold Witness
P/F
Export limit configured if requiredP/F
Generation meter installed and reading✓
CER STC assignment form completedPrefer AI?
Generate a custom Electrical ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free