Electrical Rough-In Inspection & Test Plan
Covers first-fix electrical rough-in including cable runs, conduit installation, back-box positioning and earthing continuity. Ensures compliance with AS/NZS 3000 wiring rules prior to wall lining.
17 checklist items
2 hold points
2 witness points
Checklist Preview
Cable Installation
Requires sign-offP/F
Verify cable types match specificationsP/F
Cable support and clip spacing compliantP/F
Separation from other services maintainedP/F
Fire-rated penetration sealing complete HoldPhoto
P/F
Minimum bend radius maintainedConduit & Containment
Requires sign-offP/F
Conduit sizing per design drawingsP/F
Conduit fixing centres compliant✓
Draw wire installed in empty conduitsP/F
Expansion joints provided where requiredBack Boxes & Point Positions
P/F
Back-box heights per specificationP/F
Back boxes flush with finished surfaceP/F
GPO layout matches electrical drawings Witness
P/F
Switch positions per specificationEarthing & Bonding
Requires sign-offP/F
Earth continuity test satisfactory Hold
P/F
Earth conductor sizing compliantP/F
Main earthing conductor connection verifiedP/F
Equipotential bonding to wet areas confirmed Witness
Prefer AI?
Generate a custom Electrical ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free