ElectricalCommercial
Fire Detection & Alarm System Inspection & Test Plan
Inspection and test plan for fire detection and alarm systems covering detector placement, sounder circuits, MCP positioning, zone wiring and end-of-line monitoring per AS 1670.1.
14 checklist items
3 hold points
3 witness points
Checklist Preview
Detector Installation
Requires sign-offP/F
Detector spacing per AS 1670.1P/F
Detector mounting height compliantP/F
Detector types match design for each zone Witness
P/F
Beam detector alignment verifiedP/F
Duct detectors coordinated with HVACWiring & Circuits
Requires sign-offP/F
Fire-rated cable used where specified Hold
P/F
End-of-line devices installed per zoneP/F
Fire circuits isolated from other servicesP/F
Loop resistance within manufacturer limitsPanel & Commissioning
Requires sign-offP/F
Fire indicator panel programmed per cause-effect Hold Witness
P/F
All sounders audible throughout building Witness
P/F
Manual call points tested and operationalP/F
Fire brigade connection verified Hold
✓
Zone plan affixed adjacent to FIPPrefer AI?
Generate a custom Electrical ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free