ElectricalCommercial
EV Charger Installation Inspection & Test Plan
ITP for electric vehicle charger installations covering circuit design, cable sizing, OCPP commissioning, load management and compliance with AS/NZS 3000 and AS/NZS 3001.9.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Circuit Design & Protection
Requires sign-offP/F
Supply circuit capacity per charger ratingP/F
Cable sizing per AS/NZS 3008 for charger loadP/F
Type B RCD protection installed (or per spec) Hold
P/F
Dynamic load management configuredPhysical Installation
Requires sign-offP/F
Charger unit mounted at compliant heightP/F
Bollard or physical protection installedP/F
Cable management and holster secureP/F
EV parking signage installedCommissioning
Requires sign-offP/F
Charger powered up and self-test passedP/F
OCPP backend connection established Witness
P/F
Full charge cycle tested with vehicle Hold
P/F
Earth fault loop impedance satisfactoryPrefer AI?
Generate a custom Electrical ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a electrical supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
