Earthing & Lightning Protection Inspection & Test Plan
ITP for building earthing systems and lightning protection covering earth electrode installation, bonding conductors, earth resistance testing and lightning rod placement per AS/NZS 3000 and AS 1768.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Earth Electrode System
Requires sign-offP/F
Electrode type and burial depth per design#
Earth resistance (Ω) Hold
P/F
Electrode connections exothermically weldedPhoto
P/F
Ring earth continuity verifiedBonding Conductors
Requires sign-offP/F
Main earth bar connections verified Hold Witness
P/F
Structural steel bonding completeP/F
Water pipe bonding connectedP/F
Bonding conductor sizing per AS/NZS 3000Lightning Protection
Requires sign-offP/F
Air terminal placement per risk assessmentP/F
Down conductor routing and fixings compliantP/F
Test joints accessible and labelledP/F
SPD coordination across zonesPrefer AI?
Generate a custom Electrical ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a electrical supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free