ConcreteIndustrial
Tilt-Up Panel Inspection & Test Plan
ITP for tilt-up concrete panel construction covering casting bed preparation, panel reinforcement, lifting hardware, tilt sequence planning and temporary bracing per AS 3850.
13 checklist items
4 hold points
2 witness points
Checklist Preview
Casting Bed Preparation
Requires sign-offP/F
Casting slab surface smooth and levelP/F
Bond breaker uniformly appliedP/F
Edge forms set to panel dimensionsP/F
Opening blockouts positioned per drawingsPanel Reinforcement & Embedments
Requires sign-offP/F
Reinforcement placement per structural drawings Hold Witness
P/F
Lifting inserts positioned per engineer design Hold
P/F
Bracing insert positions verifiedP/F
Connection hardware cast-in per detailsTilt & Erection
Requires sign-offP/F
Minimum concrete strength achieved for tilt Hold Witness
P/F
Crane capacity verified for panel weightP/F
Temporary bracing installed immediately Hold
P/F
Panel plumb and alignment verified✓
Brace removal criteria documentedPrefer AI?
Generate a custom Concrete ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a concrete supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free
