Concrete Pre-Pour Inspection & Test Plan

Pre-pour inspection covering formwork dimensions, reinforcement placement, embedments, hold-down bolts and concrete cover verification prior to concrete placement per AS 3600.

16 checklist items
3 hold points
1 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Formwork Verification

Requires sign-off
P/F
Formwork dimensions per structural drawings
P/F
Formwork alignment plumb and level
P/F
Formwork clean and release agent applied
P/F
Bracing and props secure

Reinforcement

Requires sign-off
P/F
Bar size and spacing per drawings
Hold Witness
#
Cover depth (mm)
Hold
P/F
Lap lengths per specification
P/F
Bar chairs and tie wire adequate
P/F
Reinforcement continuity at construction joints

Embedments & Cast-Ins

P/F
Hold-down bolt positions verified
Hold
P/F
Conduit and sleeve placement per services drawings
P/F
Ferrules and embedments positioned correctly

Concrete Specification

Requires sign-off
P/F
Concrete grade per structural specification
P/F
Slump requirement noted for testing
P/F
Exposure classification verified
✓
Pour sequence agreed with contractor

Prefer AI?

Generate a custom Concrete ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a concrete supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free