ConcreteCommercial
Concrete Pre-Pour Inspection & Test Plan
Pre-pour inspection covering formwork dimensions, reinforcement placement, embedments, hold-down bolts and concrete cover verification prior to concrete placement per AS 3600.
16 checklist items
3 hold points
1 witness points
Checklist Preview
Formwork Verification
Requires sign-offP/F
Formwork dimensions per structural drawingsP/F
Formwork alignment plumb and levelP/F
Formwork clean and release agent appliedP/F
Bracing and props secureReinforcement
Requires sign-offP/F
Bar size and spacing per drawings Hold Witness
#
Cover depth (mm) Hold
P/F
Lap lengths per specificationP/F
Bar chairs and tie wire adequateP/F
Reinforcement continuity at construction jointsEmbedments & Cast-Ins
P/F
Hold-down bolt positions verified Hold
P/F
Conduit and sleeve placement per services drawingsP/F
Ferrules and embedments positioned correctlyConcrete Specification
Requires sign-offP/F
Concrete grade per structural specificationP/F
Slump requirement noted for testingP/F
Exposure classification verified✓
Pour sequence agreed with contractorPrefer AI?
Generate a custom Concrete ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free