Post-Tensioning Inspection & Test Plan

ITP for bonded and unbonded post-tensioning systems covering tendon profiling, anchor zone reinforcement, stressing operations, elongation checks and grouting per AS 3600.

15 checklist items
4 hold points
2 witness points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Tendon Installation

Requires sign-off
P/F
Tendon profile per PT drawings
Hold
P/F
Tendon spacing compliant
P/F
Anchorage hardware correctly installed
P/F
Duct integrity verified (no damage)
P/F
Anchor zone reinforcement per design
Hold

Stressing Operations

Requires sign-off
P/F
Minimum concrete strength for stressing achieved
Hold Witness
P/F
Jack calibration certificate current
P/F
Stressing sequence per engineer specification
P/F
Elongation within ±7% of calculated
Hold
#
Measured elongation (mm)
P/F
Lock-off force recorded

Grouting (Bonded System)

Requires sign-off
P/F
Grout mix design per specification
P/F
Grout injection continuous from low to high point
Witness
P/F
Grout cube strength satisfactory
P/F
Anchor pocket filled and sealed

Prefer AI?

Generate a custom Concrete ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a concrete supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free