Concrete Post-Pour Inspection & Test Plan
Post-pour inspection ITP covering curing regime, formwork stripping, surface finish assessment, dimensional checks and compressive strength test results per AS 3600.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Curing
Requires sign-offP/F
Curing method as specified (compound/water/membrane)P/F
Curing commenced within specified timeframe Hold
P/F
Minimum curing duration maintainedP/F
Ambient temperature during curing recordedFormwork Stripping
Requires sign-offP/F
Minimum stripping strength achieved Hold Witness
P/F
No damage observed on formwork removalP/F
Reshoring installed where requiredQuality Assessment
Requires sign-offP/F
Surface finish meets class requirementP/F
No honeycombing or voids observedPhoto
P/F
Dimensional tolerances within AS 3600 limitsP/F
Crack assessment satisfactory#
28-day compressive strength result (MPa) Hold
Prefer AI?
Generate a custom Concrete ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.
Free AI ITP Generator →Also free from the HoldPoint QA team: a concrete supplier price list template (Excel), to check supplier invoices against with CostCode.
Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.
Get started free