All templates
ConcreteCommercial

Formwork System Inspection & Test Plan

ITP for formwork system erection covering design certification, prop loading, shore spacing, alignment verification, safety provisions and striking criteria per AS 3610.

13 checklist items
2 hold points
Use this template, it's free

Used on live Australian projects

DynafixTreu Construct
Read their stories

Checklist Preview

Design & Documentation

Requires sign-off
P/F
Formwork design certified by engineer
Hold
✓
Safe work method statement reviewed
P/F
Formwork materials in serviceable condition

Erection & Alignment

Requires sign-off
P/F
Base plates on adequate bearing surface
P/F
Shore spacing per formwork drawings
Hold
P/F
Props plumb and braced
P/F
Camber provision per engineer specification
P/F
Bearer and joist spacing compliant
P/F
Deck sheets free from damage and gaps

Safety & Striking

Requires sign-off
P/F
Edge protection installed at all open edges
P/F
Safe access provided to all work areas
P/F
Striking criteria defined and documented
#
Minimum stripping strength requirement (MPa)

Prefer AI?

Generate a custom Concrete ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles, tailored to your project.

Free AI ITP Generator →

Also free from the HoldPoint QA team: a concrete supplier price list template (Excel), to check supplier invoices against with CostCode.

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free, no credit card required.

Get started free